Project: EKP/CCD 345 kV Transmission Interconnection Project
Company: East Kentucky Power Cooperative, Inc.
Case No.: 03-0132-EL-BTX
Location: Brown County
Status: Construction completed on November 24, 2004 East Kentucky Power
East Kentucky proposed to build a 345 kV loop from the Spurlock Station to the Zimmer-Stuart 345 kV transmission line. The project required 1.7 miles of double circuit 345 kV transmission line from the Ohio border to the Zimmer-Stuart 345 kV transmission line. The Board approved the project on February 12, 2004. Construction of the transmission line is complete and the line is energized.
Opinion, Order, and Certificate