Ohio Power Siting Board 00-0670-EL-BGN: Duke Energy, Washington 620 MW Combined-Cycle Turbine Project

620 MW Combined-Cycle Combustion Turbine Project
Duke Energy Washington, LLC
Case No. 00-0670-EL-BGN

The applicant  proposed to install 620 MW combined-cycle gas turbines in Waterford Township, Washington County.  The facility utilizes two GE 7FA combustion turbines with  SCR´s.

The application was filed on April 19, 2000.  The Staff Report was issued August 21, 2000.  The public and adjudicatory hearings were held on September 5 and September 6, 2000.  The Board certificated the facility on October 16, 2000.  A pre-construction conference was held December 22, 2000.  Construction took place during 2001-2002

The facility became operational in June 2002.

Other Information:

Docket Card

Staff Report

Order, Opinion, and Certificate