Local public hearing: Emerson Creek Wind Farm

Case Number: 18-1607-EL-BGN
Project: Emerson Creek Wind Farm
Applicant: Firelands Wind, LLC
Location: Erie and Huron counties

The Applicant seeks Board approval of a wind-powered electric generation facility consisting of up to 71 wind turbines at 87 possible locations with a maximum total generating capacity of approximately 297.66 megawatts.

Local public hearing
March 18, 2020, at 3 p.m.
Bellevue Veterans of Foreign Wars
6104 US-20
Bellevue, Ohio