Case No.: 11-4885-EL-BSB
Project:  
   London Substation Project
Company: American Transmission Systems, Inc.
Location:   Madison County
Status:       Approved

On May 18, 2012, the Applicant filed applications to construct approximately 58.5 miles of new 138 kV electric transmission line and to convert an existing distribution substation into a transmission/distribution substation.  About 15 miles of the proposed line between Springfield and London would be installed onto existing transmission line structures.  Construction of this new line would provide for additional capacity, which would alleviate potential loss of service and also support future economic growth in the area.  The existing London Substation would require only minor modifications within the fence line to convert it to a transmission switching substation.  The Board authorized construction on March 11, 2013.

Local Public Hearings

January 7, 2013 at 6:00 p.m
Pleasant Valley Fire Department
650 West Main Street
Plain City, Ohio 43064

January 8, 2013 at 6:00 p.m.
London City Council Chambers
6 East 2nd Street
London, Ohio 43140

Evidentiary Hearing

January 23, 2013 at 10:00 a.m.
Public Utilities Commission of Ohio
180 East Broad Street
Columbus, Ohio 43215