18-1360-EL-BGN: Hardin Solar Energy II Facility

Case Number: 18-1360-EL-BGN
Project: Hardin Solar Energy II Facility
Applicant: Hardin Solar Energy II , LLC
Location: Hardin County
Status: Staff investigation

The Applicant proposes to construct a solar-powered electric generation facility with a maximum total generating capacity of 170 megawatts in Hardin County.

Local public hearing
March 14, 2019, at 6 p.m.
Kenton High School
200 Harding Ave., Cafeteria
Kenton, Ohio 43326

Adjudicatory hearing
March 28, 2019, at 10 a.m.
Offices of the Public Utilities Commission of Ohio
180 E. Broad St., Hearing Room 11-D
Columbus, Ohio 43215

Participate and stay informed