19-1073-EL-BTX: Emerson Creek Transmission Line

Case number: 19-1073-EL-BTX
Project: Emerson Creek Transmission Line
Applicant: Firelands Wind, LLC
Location: Huron and Erie counties
Status: Staff investigation

The Applicant proposes to construct an 8.7-mile long electric transmission line and a point of interconnection switchyard to deliver power generated by the proposed Emerson Creek Wind Farm to the electric transmission grid. The transmission line would be located in Oxford, Lyme, and Ridgefield townships. The switchyard would be located along the American Transmission Systems Inc. (ATSI) 345 kV Beaver-Davis Besse circuit.

Local public hearing:
April 6, 2020, at 6 p.m.
Bellevue Veterans of Foreign Wars
6104 US-20
Bellevue, Ohio

Adjudicatory hearing:
May 5, 2020, at 10 a.m.
Hearing room 11-A
Offices of the Public Utilities Commission of Ohio
180 East Broad Street
Columbus, Ohio