09-0750-EL-BSB: BP-Husky Refining, LLC, Toledo Refinery 138-69 kV Substation Project

Case No.:  09-0750-EL-BSB  
Project:     Toledo Refinery 138/69 kV Substation Project
Company: BP-Husky Refining, LLC
Location:  Lucas County
Status:      Operational 

On September 23, 2009, the Applicant filed an application with the Board to construct a new 138/69 kV transmission substation.  The substation will facilitate the installation of new catalyst technology that is more reliable and operates with reduced air emissions.  The Preferred and Alternate sites are located in an industrial area, adjacent to the Toledo refinery.  Electrical interconnections for the proposed facility are the subject of a separate filing with the Board (09-860-EL-BLN).  A local public hearing was held on January 21, 2010, and the adjudicatory hearing commenced on January 27, 2010.  The Board certificated this project on March 22, 2010, and the facility became operational on November 1, 2012.

Other Information:

Staff Report

Opinion, Order & Certificate

Docket Card