15-0329-EL-BTX: AEP South Caldwell-Macksburg 138 kV Transmission Line

Case number: 15-0329-EL-BTX
Project: South Caldwell-Macksburg 138 kV Transmission Line Project
Applicant: AEP Ohio Transmission Company 
Location: Noble and Washington counties
Status: Under construction

In this project, AEP Ohio Transmission Company will construct an 8-mile long 138 kilovolt transmission line connecting its South Caldwell Substation, passing through its South Olive Substation, to its Macksburg Substation. The transmission line will run through Olive, Jackson, and Jefferson townships in Noble County and Aurelius Township in Washington County.