16-1871-EL-BGN: Icebreaker Wind Facility

Case Number: 16-1871-EL-BGN
Project: Icebreaker Wind Facility
Applicant: Icebreaker Windpower, Inc.
Location: Lake Erie, Cuyahoga County
Status: Staff investigation

The Applicant proposes to construct a six turbine wind-powered electric generation facility in Lake Erie, approximately 8 to 10 miles off the shore of Cleveland. The turbines are expected to have a nameplate capacity of 3.45 megawatts (MW) each, with a combined generating capacity of 20.7 MW. The project would also include include an 11.8-mile long submerged electric line to transmit power to Cleveland Public Power's onshore Lake Road substation.

Local Public Hearing
November 8, 2017
6 p.m.
Cleveland City Council Chambers
Cleveland City Hall
2nd Floor – Room 216
601 Lakeside Ave.
Cleveland, Ohio 44114

Adjudicatory Hearing
November 17, 2017
10 a.m.
Hearing Room 11-C
Offices of the PUCO
180 E. Broad St.
Columbus, Ohio 43215