17-2084-EL-BTX: Harrison Power 138 kV Transmission Line

Case Number: 17-2084-EL-BTX
Project: Harrison Power 138 kV Transmission Line
Applicant: Harrison Power Transmission, LLC
Location: Harrison County
Status: Approved

Harrison Power Transmission will construct an approximately 5-mile long 138 kilovolt transmission line from the proposed Harrison Power Substation in the Harrison County Industrial Park to the newly constructed AEP Nottingham Substation. The project will provide a connection from the proposed Harrison Power Plant in the Harrison County Industrial Park to the AEP Nottingham Substation in Athens Township.

Participate and stay informed